Thursday, May 28, 2009

TNB JANAMANJUNG SDN BHD






Manjung

Location: Perak
Operator: TNB Janamanjung Sdn Bhd
Configuration: 3 X 700 MW
Operation: 2002-2003
Fuel: bituminous and subbituminous coal
Boiler supplier: Stein
T/G supplier: Alstom
EPC: Alstom, Jurong Engineering, Studio Tecnico di Ingegneria, Peremba Construction
Quick facts: This power station has the tallest stack in Malaysia - 197m - which is also the first triple-flue stack built in the country. Civil construction features include 250,000 cubic m of concrete, 30,000t of structural steel, 25,000t of steel reinforcement, a 1.5km offshore cooling intake, and a 100m long offshore outfall. Alstom also supplied a seawater FGD system

2 comments:

  1. ada tak gambar land rover fire engine kat sana?

    ReplyDelete
  2. tnb ni mmg kaya,tp dgn pkerja kontrak kedekut tahap celaka

    ReplyDelete